APPLICATION

Lithium battery products cover the entire line, with a wide range of products covering various fields

Contact +

Mobile charging cabinet solution


Addressing pain points

1. Solve the problem of charging queues for pure electric mud trucks during the restricted period, and arrange mobile or fixed charging points according to operational needs;
2. Solve the peak pressure on the power grid side, and stagger the peak of the power grid through mobile charging and fixed slow charging and fast discharging;
3. To solve the problem of wasting time searching for charging stations outside the mud head, mud tail, and work route for pure electric mud trucks, it is possible to pull and run more quickly, and increase operational efficiency by running more trips.

Exterior dimensions 9125*2438*2896mm
Total power 1380 kWh (690v2000Ah, full charge 2.5h)
Available power > 1175 kWh (20 dump trucks can be used during the ban period, and each vehicle will be charged 55-60 kWh)
input AC 380V/DC Charging (Pile Charging)
output 4 x 150KW charging cables (can charge 2 dump trucks at the same time, each car takes 1.5h to fully charge), and 380V AC mains